Back to MylogHOME.us

Some Assembly Required
Installing the Hardwood Floor Part 2
click on pictures for enlargements


It is always fun to have friends drop by from
Mississippi. Sharon Blackledge, Jonah Gunalda,
Rachel and Carroll Blackledge ride the Charlie Horse.


   Moving right along up the
   hall the installation of the
   floor continues.


After finishing the floor in the guest bath, Bob and
 Carey Evans moved in the washer dryer. Without the
 Charlie Horse they would have never made it up
the mountain with that heavy load.


    Lyda is proud of her new washer/dryer.

It took 4 days, including the trip from Mississippi,
 unloading and moving of all the wood and appliances
 up the mountain into the cabin to accomplish the
 installation of about 1/2 of the flooring.
We hope to finish the flooring on the next trip
completing another exciting task of the adventure.

 

Back     Next