Back to MylogHOME.us

Some Assembly Required
Electrical Work Continues
click on pictures for enlargements


Building the meter Base & service pole

With the meter base mounted on
the house, the hard work is complete!


   Two of the 4 wires are in.


Cutting holes in the log for the
3 gang switches involves
sawing, drilling and chiseling.


     It takes concentration not to
     drill all the way through the log.
     It just needs to be 4" deep.


Before drilling Bob used a SawsAll
and cut out the area for the switches.

 
   Bob works supervision from
   the master builder.

I
It's a bit warm doing wiring
in the attic even in the month of May

That scaffolding sure helps
a short guy get to tall places..


  Dad working on the bathroom
  wiring.


  Dad cutting some wood braces.
  Watch out for those fingers!!

Back     Next